Timberline Engineering is very happy to announce they have been selected to perform a communications study, design, and construction support for Placer County Water Agency in Auburn, California.
This project marks the resumption of a very successful relationship that began in 1999 and included two major projects and a series of studies and smaller projects over a nine-year period. In the summer of 1998 PCWA contracted with Timberline Engineering to study their SCADA system communication needs. This lead to the first of two projects, which resulted in the installation of communication towers as Sunset and Auburn water treatment plants (WTPs), the conversion of a number of PCWA sites from telephone to radio communications, and the installation of microwave radio links between Foothill, Sunset, and Auburn WTPs. After those projects, Timberline performed a series of studies and smaller projects including the I-80 Corridor Communications Study. All of Timberline's projects with PCWA were performed by the same Timberline team and managed by the same Timberline project manager; that same team will perform this upcoming project.
After many years of looking at an old, increasingly out of date website, Timberline finally said enough is enough and set down to redesign our website. We hope you like the result. On the home page, you will find articles about what's happening at Timberline. If you are interested in learning more about the services we offer and the projects we've completed, we have that for you as well.